
في:
قيد الإنشاء
الخريطة
اطلب فيديو


11
خليج الجنوب 2، خليج الجنوب، المنطقة السكنية جنوب دبي، دبي الجنوب، دبي
3 غرف
4 حمامات
2,894 قدم مربع
تاون هاوس في خليج الجنوب 2،خليج الجنوب،المنطقة السكنية جنوب دبي،دبي الجنوب 3 غرف 3390000 درهم - 11352290
BetterHomes are pleased to present this three-bedroom townhouse in South Bay, Dubai South, offering a built-up area of 2,894 sq. ft. and set on a 2,099 sq. ft. plot. Positioned on a single row, the property benefits from added privacy and open views, making it a desirable option for those seeking a more peaceful residential setting.
The home features a well-balanced layout with open-plan living areas and defined family spaces, ideal for modern lifestyles. Completion is scheduled for Q2 2026, with a two-year post-handover payment plan available—providing flexibility for both end users and investors.
South Bay is poised to become one of Dubai’s key residential destinations, with future access to waterfront amenities, landscaped parks, and close proximity to Al Maktoum International Airport and key logistics hubs. This is a strong opportunity to secure a property in a high-growth location with long-term upside.
- BUA: 2,894 sq. ft.
- Plot: 2.099 sq. ft.
- Single Row
- Completion Q2 2026
- Great potential
The home features a well-balanced layout with open-plan living areas and defined family spaces, ideal for modern lifestyles. Completion is scheduled for Q2 2026, with a two-year post-handover payment plan available—providing flexibility for both end users and investors.
South Bay is poised to become one of Dubai’s key residential destinations, with future access to waterfront amenities, landscaped parks, and close proximity to Al Maktoum International Airport and key logistics hubs. This is a strong opportunity to secure a property in a high-growth location with long-term upside.
- BUA: 2,894 sq. ft.
- Plot: 2.099 sq. ft.
- Single Row
- Completion Q2 2026
- Great potential
معلومات عن العقار
- نوع العقارتاون هاوس
- نوع العرضللبيع
- الرقم المرجعيبيوت - TH740292S
- حالة البناءقيد الإنشاء
- التأثيثغير مفروشة
- TruCheck™ في15 أبريل 2025
- تاريخ الإضافة15 أبريل 2025
- تاريخ التسليمالربع 2 من عام 2026