قيد الإنشاء
الخريطة
اطلب فيديو11
تاون هاوس في مرجان السعديات،جزيرة السعديات 4 غرف 13000000 درهم - 10167043
Murjan Al Saadiyat is a luxurious residential community being launched along the pristine shores of Saadiyat Island. The project is being developed by a reputable developer of AMS Real Estate Management. As of Q3 2023, Murjan Al Saadiyat is under construction, and has an estimated date of handover set to be in June 2025.
The residential neighbourhood provides a resort-style lifestyle with direct access to the beach. Properties in Murjan Al Saadiyat are presented by elegant townhouses with 3–4 bedrooms and villas with 6–7 bedrooms. The total number of residences is just 60. The living areas of townhouses range from 2,927 sq. ft to 3,336 sq. ft, while property sizes of villas vary from 13,433 sq. ft to 14,144 sq. ft.
Residences will be situated in a way that maximises the sun exposure on the roof terraces. Residents of Murjan Al Saadiyat will benefit from a modern gym, open areas, parks, The Clubhouse and swimming pools. Saadiyat Beach will also be easily accessible from the complex,
Residents also get access to all Jumeriah facilities.
The residential neighbourhood provides a resort-style lifestyle with direct access to the beach. Properties in Murjan Al Saadiyat are presented by elegant townhouses with 3–4 bedrooms and villas with 6–7 bedrooms. The total number of residences is just 60. The living areas of townhouses range from 2,927 sq. ft to 3,336 sq. ft, while property sizes of villas vary from 13,433 sq. ft to 14,144 sq. ft.
Residences will be situated in a way that maximises the sun exposure on the roof terraces. Residents of Murjan Al Saadiyat will benefit from a modern gym, open areas, parks, The Clubhouse and swimming pools. Saadiyat Beach will also be easily accessible from the complex,
Residents also get access to all Jumeriah facilities.
معلومات عن العقار
- نوع العقارتاون هاوس
- نوع العرضللبيع
- الرقم المرجعيبيوت - TH722646-3S
- حالة البناءقيد الإنشاء
- التأثيثغير مفروشة
- تاريخ الإضافة14 نوفمبر 2024
- تاريخ التسليمالربع 2 من عام 2025