购买
  • Time 3期房
公寓
卫浴&卧室数量
更多筛选项
交接人
付款计划
% 已完成
TruBroker
房源优先
TruCheck 房源优先
待售:
位于迪拜 的公寓期房
迪拜2个卧室
迪拜公寓大楼
Time 3

Time 3

公寓
施工中
作者是:Time Properties
起始价为
AED
49万
查看单位类型
交付
2027第3季度
Time 3 is a new development within the Dubailand Residence Complex (DLRC), offering a customized living experience with a range of options to suit your lifestyle. The sleek, striking design of the building will feature a basement, ground floor, three podium levels and 17 residential floors, housing 288 units.  
Set against lush surroundings, the development will provide a variety of apartments, from cosy studios to spacious 1, 2 and 3-bedroom apartments. Each residence will be thoughtfully designed with built-in wardrobes, private balconies and premium finishes, incorporating marble and glass. Located opposite Academic City, Time 3 Apartments will offer seamless connectivity to key destinations.
阅读更多

单位类型

1 Cover Image
2 Marketing Image 13 Marketing Image 2

期房,2 个卧室, 位于 Time 3, 迪拜公寓大楼的公寓

热门
房源
地图
    No results icon
    目前没有符合您条件的房源
    编辑过滤条件以完善搜索结果

关于 Time 3

Time 3 is a new development within the Dubailand Residence Complex (DLRC), offering a customized living experience with a range of options to suit your lifestyle. The sleek, striking design of the building will feature a basement, ground floor, three podium levels and 17 residential floors, housing 288 units.  
Set against lush surroundings, the development will provide a variety of apartments, from cosy studios to spacious 1, 2 and 3-bedroom apartments. Each residence will be thoughtfully designed with built-in wardrobes, private balconies and premium finishes, incorporating marble and glass. Located opposite Academic City, Time 3 Apartments will offer seamless connectivity to key destinations.

单位类型

公寓
AED 49万
单身公寓
类型面积(平方英尺)价格(AED
Studio354 - 62949万
1间卧室
1 Bedroom673 - 1,235-
2间卧室
2 Bedroom1,185 - 1,705-
3间卧室
3 Bedroom1,452 - 1,950-
map icon
最新drive icon按驾车时间搜寻房产
及时获取新房源信息!
1 Cover Image
2 Marketing Image 13 Marketing Image 2
Time 3
迪拜公寓大楼, 迪拜
开发商
Time Properties
项目状态
施工中
交付
2027第3季度
从开始
AED 49万