Albero by Oro24 is an off-plan residential project in Liwan, Dubai. Situated close to Dubai - Al Ain Road (E66), it will feature studio, 1 and 2-bedroom apartments. The units can be bought using multiple post-handover payment plans, with completion expected in May 2026.
The project by Oro24 Developments will feature lifestyle amenities such as a swimming pool, cabana seating, barbecue pit and rooftop lounge. Fitness options will include a health club, outdoor jacuzzi and walking trail. Residents will also find sports facilities and a kids’ play area.
Liwan is a peaceful residential area at the intersection of Dubai - Al Ain Road (E66) and Sheikh Mohammed Bin Zayed Road (E311). The community features various completed and off-plan residential projects. In 2023, apartments sold in Liwan were worth AED 130.5M. Over 2,700 rental transactions for apartments in Liwan were recorded in the same period.
The details about Albero by Oro24 payment plans are given below:
MILESTONE | INSTALMENT | %PAYMENT |
---|---|---|
MILESTONE Upon Booking |
INSTALMENT 1 |
%PAYMENT 20% |
MILESTONE Jan 2024 to Nov 2024 (1% Monthly) |
INSTALMENT 2-12 |
%PAYMENT 11% |
MILESTONE Dec 2024 |
INSTALMENT 13 |
%PAYMENT 5% |
MILESTONE Jan 2025 to Nov 2025 (1% Monthly) |
INSTALMENT 14-24 |
%PAYMENT 11% |
MILESTONE Dec 2025 |
INSTALMENT 25 |
%PAYMENT 5% |
MILESTONE Jan 2026 to Apr 2026 (1% Monthly) |
INSTALMENT 26-29 |
%PAYMENT 4% |
MILESTONE May 2026 (Completion) |
INSTALMENT 30 |
%PAYMENT 4% |
MILESTONE Jun 2026 to Sep 2029 (1% Monthly) |
INSTALMENT 31-70 |
%PAYMENT 40% |
Key Takeaways:
MILESTONE | INSTALMENT | %PAYMENT |
---|---|---|
MILESTONE Upon Booking |
INSTALMENT 1 |
%PAYMENT 15% |
MILESTONE Feb 2024 |
INSTALMENT 2 |
%PAYMENT 5% |
MILESTONE May 2024 |
INSTALMENT 3 |
%PAYMENT 5% |
MILESTONE Nov 2024 |
INSTALMENT 4 |
%PAYMENT 5% |
MILESTONE Feb 2025 |
INSTALMENT 5 |
%PAYMENT 5% |
MILESTONE May 2025 |
INSTALMENT 6 |
%PAYMENT 5% |
MILESTONE Aug 2025 |
INSTALMENT 7 |
%PAYMENT 5% |
MILESTONE Nov 2025 |
INSTALMENT 8 |
%PAYMENT 5% |
MILESTONE Feb 2026 |
INSTALMENT 9 |
%PAYMENT 5% |
MILESTONE May 2026 |
INSTALMENT 10 |
%PAYMENT 5% |
MILESTONE Jun 2026 to Apr 2029 (1% Monthly) |
INSTALMENT 11-45 |
%PAYMENT 35% |
Key Takeaways:
The project is expected to be completed in May 2026.
The project will feature leisure options like a temperature-controlled swimming pool, cabana seating, barbecue pit, badminton court, rooftop lounge and landscaped garden. A grand entrance lobby and outdoor kids’ play area will also be there. Those looking for a gym in Albero by Oro24 will find a fully-equipped health club and a walking trail.
Residents will get covered parking in Albero by Oro24.
There will be high-speed elevators in Albero by Oro24.
Security and maintenance personnel will take care of the safety and convenience of residents.
Bayut has worked on creating a simple format for 2D and 3D floor plans on the website. You can easily find the unit type and bed type you’re interested in by browsing Albero by Oro24 floor plans.
Albero by Oro24 will have 192 units, including studio, 1 and 2-bedroom apartments.
Studio apartments in Albero by Oro24 will include a bathroom, kitchen and balcony. The covered areas will span 360 sq. ft.
1-bedroom apartments in Albero by Oro24 will feature a bathroom, powder room, living/dining area, kitchen and balcony. These units will cover areas between 629 sq. ft. and 720 sq. ft.
2-bedroom apartments in Albero by Oro24 will have a bathroom, powder room, living/dining area, kitchen and balcony. The covered areas will range from 745 sq. ft. to 906 sq. ft.
Information for apartment type is currently not available on Albero by ORO24.
Information for average price is currently not available on Albero by ORO24.
It takes about a 7-minute drive to get to Dubai - Al Ain Road (E66) and Sheikh Mohammed Bin Zayed Road (E311). One can also rely on Dubai public transportation near Albero by Oro24.
Mazaya 4 Bus Stop is about a 2-minute walk away. One can board bus 30 at the station.
Creek Metro Station, on the Green Line of Dubai Metro, is about a 17-minute drive away. The nearest Red Line option is Max Metro Station, located at an 18-minute drive away.
Those living in Liwan can find various dining options within easy access. These include:
All these restaurants near Albero by Oro24 are located within a 3-minute drive.
Popular supermarkets near Albero by Oro24 Liwan Dubailand include:
One can get to these stores within a 4-minute drive.
Silicon Central Mall is a popular shopping venue just a 6-minute drive away. It features various shopping and dining options and leisure facilities like a cinema, kids’ park and VR arcade.
IMG Worlds of Adventure is Dubai’s largest indoor theme park located at an 8-minute drive from the project’s location. It has various rides and attractions distributed across the six zones. Moreover, you will find a 12-screen cinema and dining options at the park.
Cityland Mall, located within a 13-minute drive away, spans 1.2 million sq. ft. It features a wide range of shopping and dining options besides salons, a central park, pharmacies and a Carrefour Market.
Albero by Oro24 Liwan will have studio, 1 and 2-bedroom apartments.
Albero by Oro24 Liwan Dubai's completion is expected in May 2026.
Albero by Oro24 is located in Liwan, Dubai.
Featured image credit: Oro24 Developments